LS 22 THE LAB GAS AND CHEMICAL PLANT V1.0.0.2
V1.0.0.2 – Fixed something I broke with the stone crusher.
The Lab – Gas and Chemical Plant – Construction Costs: $190,000
Inputs (BioGas – 4 Options):
Manure
Liquid Manure
Silage
Sugarbeet Cut
Outputs:
Electric Charge
Methane
Digestate
Inputs (Thermal Hydrogen Extraction) :
Digestate
Woodchips
Water
Outputs:
Hydrogen
Nitrogen
Oxygen
Inputs (Electrolytic Hydrogen Extraction) :
Electric Charge
Water
Outputs:
Hydrogen
Oxygen
Inputs (Stone Carbon Extraction) :
Woodchips
Stone
Outputs:
Carbon
Oxygen
Inputs (Anhydrous Ammonia) :
Nitrogen
Hydrogen
Outputs:
Anhydrous
Inputs (Propane) :
Carbon
Hydrogen
Outputs:
Propane
Inputs (Diesel) :
Propane
Outputs:
Diesel